Pump Safety
Pump Safety Features:
Pre-set Emulsion to gassing ratio, optimised for BME’s Innovex UG Emulsions
Emulsion Tank Capacity | Minimum 2500 kg. |
Sensitizer Tank Capacity | Dependent on Emulsion Capacity. |
Water Tank Capacity | Dependent on Emulsion Capacity. |
Pumping Rate |
|
Drive System | Hydraulic. |
Optional levels of ECU integrated technology: | |
Entry Level | For production environments where minimal operational complexity is required and where digital charging data reporting and analytics are not required. |
Intermediate | For production environments where operational complexity can be accommodated and production decisions are data-driven. |
Advanced | Technologically advanced production environments where data-driven decisions are the cornerstone of mining enhancement. |
Legend | ||||
○
Standard |
•
Entry Level Control System |
••
Intermediate Control System |
•••
Advanced Control System |
x
On Request |
ECU Use
Description | Emulsion Charging Unit Types | |||
Lateral ECU |
Up-Hole ECU |
Combination ECU |
Secondary Breaker |
|
Development | ○ | ○ | ||
Up-Hole | ○ | ○ | ||
Down-Hole | ○ | |||
Secondary Breaking |
○ | |||
Dual Density | x | x |
Tanks
Description | Emulsion Charging Unit Types | |||
Lateral ECU |
Up-Hole ECU |
Combination ECU |
Secondary Breaker |
|
Emulsion Tank | ○ | ○ | ○ | ○ |
Gassing Tank | ○ | ○ | ○ | ○ |
Flushing Tank | ○ | ○ | ○ | ○ |
Lubrication Tank | x | ○ | ○ | x |
Pumping
Description | Emulsion Charging Unit Types | |||
Lateral ECU |
Up-Hole ECU |
Combination ECU |
Secondary Breaker |
|
M2M Pump | ○ | ○ | ○ | ○ |
Dual Pumping | ○ | ○ | ○ | ○ |
Independent/Combined Pumping | x | x | x |
ECU Accessories
Description | Emulsion Charging Unit Types | |||
Lateral ECU |
Up-Hole ECU |
Combination ECU |
Secondary Breaker |
|
BME Boom 5 m | x | |||
BME Boom 7 m | x | |||
Hose Pusher | ○ | ○ | ||
Hose Reel | ○ | ○ | ||
Hose Reel Cage | x | x | ||
Up-Hole Snorkel | x | |||
Up-Hole Snorkel Slew |
x | |||
Robotic Injector Unit | ○ | |||
Integration with 3rd Party Boom and/or Basket | x | x | ||
Basic Remote Control Functionality |
○ | x | ○ | |
Robotic Arm Remote Functionality | ○ | |||
Integration with SBU Remote |
x |
Control System Displays
Description | Emulsion Charging Unit Types | |||
Lateral ECU |
Up-Hole ECU |
Combination ECU |
Secondary Breaker |
|
4” Display Screen | • | • | ||
7” Display Screen | •• | • / •• | • / •• | •• |
12.1” Touch Screen | ••• | ••• | ••• | ••• |
Control System Monitoring
Description | Emulsion Charging Unit Types | |||
Lateral ECU |
Up-Hole ECU |
Combination ECU |
Secondary Breaker |
|
Hydraulic Pressure | ○ | ○ | ○ | ○ |
Hydraulic Temperature | ○ | ○ | ○ | ○ |
Emulsion Pressure | ○ | ○ | ○ | ○ |
Emulsion NRV Condition | •• / ••• | •• / ••• | •• / ••• | •• / ••• |
Tank Low-Level Warning (Only) |
•• / ••• | •• / ••• | •• / ••• | •• / ••• |
Hose Protection | •• / ••• | •• / ••• | ||
Tank Flushing Mode | ••• | ••• | ••• | ••• |
Active Tank Levels | ••• | ••• | ••• | ••• |
Gassing System | •• / ••• | •• / ••• | •• / ••• | •• / ••• |
Lubrication System | ••• | ••• | ••• | ••• |
High/Low Density Selection |
••• | ••• |
System Data Logging
Description | Emulsion Charging Unit Types | |||
Lateral ECU |
Up-Hole ECU |
Combination ECU |
Secondary Breaker |
|
Hole Selection Log | ○ | ○ | ○ | ○ |
Ring/Face Selection Log | ○ | ○ | ○ | ○ |
Emulsion Pumped per Hole |
○ | ○ | ○ | ○ |
Emulsion pumped per Ring/Face |
○ | ○ | ○ | ○ |
Emulsion Pumped Per Shift | ○ | ○ | ○ | ○ |
MP2 Pump Run Times | ○ | ○ | ○ | ○ |
System Flushing Log | ••• | ••• | ••• | ••• |
Emulsion Pressures | ○ | ○ | ○ | ○ |
Hydraulic Pressures | ○ | ○ | ○ | ○ |
Lubrication System Log | ••• | ••• | ••• | ••• |
Gassing System Log | •• / ••• | •• / ••• | •• / ••• | •• / ••• |
System Troubleshooting Log | •• / ••• | •• / ••• | •• / ••• | •• / ••• |
Tank Levels Log | ••• | ••• | ••• | ••• |
System Calibration Log | •• / ••• | •• / ••• | •• / ••• | •• / ••• |
Applicable System Warnings and Trips Log |
○ | ○ | ○ | ○ |
Hose Depth Log | ○ | ○ | ||
Multi-Piming Log | ○ | ○ | ||
Dual Density Selection Log |
••• | ••• |
Data Log Communication
Description | Emulsion Charging Unit Types | |||
Lateral ECU |
Up-Hole ECU |
Combination ECU |
Secondary Breaker |
|
USB Download | ○ | ○ | ○ | ○ |
Tablet Integration | ••• | ••• | ••• | ••• |
Live Dashboard Reporting* | ••• | ••• | ••• | ••• |
* Please note: Live Dashboard reporting requires a stable Wi-Fi connection to ensure communication with the server. Therefore, Live Dashboard Reporting will only be integrated at mines where an existing full-functioning Wi-Fi infrastructure is installed. |
BME’s remote-operated Robotic Boom up-hole charging unit uses up-hole blasting practices for emulsion transfer into vertically drilled holes, commonly known as rings.
In case of emergencies, click here to contact our team for assistance.
Omnia disclaims all liability whatsoever, whether arising in contract, delict (including negligence) or otherwise in relation to the use of any products/solutions or services and all implied warranties, terms and conditions relating to the products/solutions or services (whether implied by statue, common law or otherwise), including (without limitation) any warranty, term or condition as to accuracy, completeness, satisfactory quality, performance, fitness for purpose or any special purpose, non-infringement, information accuracy, as between Omnia and you, are hereby excluded. Omnia specifically disclaims liability and will not be responsible for, any liability or damages, howsoever arising, resulting from the use or reliance upon the information in this document.
You assume sole responsibility for results obtained from the use of the products/solutions or services, and for conclusions drawn from such use.
We continuously update our technical data sheets to reflect the most current and accurate information based on the latest available data. As such, the information provided is subject to revision. We recommend regularly checking for updates to ensure you are accessing the most up-to-date technical details.